Contact Title
Need any help? Call: (+971) 6 553 1532

Suyouh Mall

Project Information

Project

Suyouh Mall

Job execution

The buildings are served by common pump room located ground floor where the fire pumps, water supply transfer pumps are installed and booster pump with water tank installed in roof. Air cooled chiller with FAHU’s, AHU’s and FCU’s used for the air-conditioning.

Total Tonnage of AC units is 1960 TR.
7 no’s of LV panel with total connected load of 8448.32 KW